Supply Chain Execution Software

Contact us

HHLA TK Estonia Goes Live with Solvo.TOS 6.4

HHLA TK Estonia Goes Live with Solvo.TOS 6.4

Ten months, one powerful upgrade, countless efficiency wins!

Project Overview

In August 2019, the container terminal of HHLA TK Estonia AS — part of Hamburger Hafen und Logistik AG (HHLA) — successfully launched Solvo.TOS 6.4 at the Port of Muuga, Estonia. The implementation project was completed in just 10 months.

The main objective was to modernize terminal operations by replacing the legacy Solvo.CTMS system with the latest version of Solvo.TOS, enabling more advanced planning, automation, and integration capabilities.

About Solvo.TOS

Solvo.TOS is a next-generation terminal operating system that manages all aspects of container terminal operations, including:

  • Vessel, truck, and rail planning
  • Container weighing and CFS operations
  • Yard planning and real-time control
  • Housekeeping and KPI tracking
  • Integration with external systems
  • Support for automated equipment and smart routing

Project Goals

According to Stanislav Koval, Head of IT and Development at HHLA TK Estonia AS:

“We wanted to upgrade the system to gain access to modern terminal management features and add tools like yard visualization, layout editing, and vessel stowage planning. We also implemented a new block train planning module and integrated Solvo.TOS with external systems via JMS in XML format.”

Terminal Profile

Key Services

  • Handling of container, RO-RO, and LO-LO vessels
  • General and bulk cargo operations
  • Storage in bonded and regular warehouses
  • Reefer container connection and monitoring
  • Oversized and heavy cargo handling
  • Cross-docking of trailers and containers

Infrastructure

  • Cargo turnover: > 650,000 TEUs
  • Terminal area: 55.94 ha
  • Reefer capacity: 404 simultaneous connections
  • Railfront: Two rail tracks for 150 platforms (block trains)
  • Berths: Four, totaling 1096 m in length, 12.5–14.5 m depth

Container Handling Equipment

  • 3 STS cranes (Konecranes, 40 t)
  • 1 RMG crane (Konecranes, 40 t)
  • 6 RTG cranes (Kalmar & Konecranes)
  • 9 reach stackers (15–45 t)
  • 9 shuttle carriers (Kalmar & Konecranes)
  • 8 port trucks (SISU)
  • Multitrailer system (Buiscar)

Key Functionality and Customization

Vessel and Yard Planning

  • Bird’s-eye yard view and interactive layout editor
  • 3D vessel stowage module with semi-automatic planning
  • EDI processor and intelligent crane sequencing algorithms

Rail Operations

  • Block train stowage planning directly in the TOS
  • Automated container allocation based on railway regulations
  • Equipment and operator assignment with real-time visualization

Smart Equipment Control

  • Dynamic routing based on job priority, distance, and CHE performance
  • Optimized routing and job sequencing to reduce idle time

Additional Modules

  • Empty Container Depot (ECD)
  • Automated STS operator’s workstation

Integration

Solvo.TOS was integrated with:

  • HHLA’s Terminal Community System (TCS)
  • The terminal’s ERP system via EDBic (Compacer platform)

Results and Efficiency Gains

Following the implementation of Solvo.TOS 6.4, HHLA TK Estonia achieved measurable improvements:

  • Faster vessel handling (up to 90 containers/hour)
  • Truck turnaround time reduced to ~25 minutes
  • Reduced container dwell time in yard
  • Minimized rehandles and CHE idle time
  • Improved data visibility for clients and partners
  • More accurate paperwork & fewer commercial errors
  • Streamlined remote document exchange

Conclusion

The Solvo.TOS 6.4 upgrade enabled HHLA TK Estonia to fully modernize operations and unlock new efficiencies in vessel, rail, and yard management — setting a new standard for digital port operations in the Baltic region.

Enjoying this article? Share it with the world!
News

Our latest news

Cargo vessel berthed at a multipurpose port terminal with quay cranes

Egypt occupies an unusual position in global maritime logistics. Its ports operate on both the Mediterranean and Red Sea coasts, while the Suez Canal places the country directly on one of the ...

CFS value-added services with cargo inspection, weighing, labeling, traceability and status control in a terminal warehouse

A CFS does much more than receive, store and release cargo. Every day, terminal warehouses may inspect shipments, verify customs status, weigh cargo, print labels, repack goods, take photographs, ...

CFS Cargo Release: Reduce Truck Waiting and Warehouse Delays

Cargo release is often treated as the final step of a CFS operation. In practice, however, delays at the loading dock usually begin much earlier. A truck may wait because cargo was stored without ...

Cargo ships and harbor cranes at a commercial seaport

Solvo will participate in Transport Middle East 2026, the international ports and logistics exhibition and conference taking place from 29 September to 1 October 2026 at the Renaissance Cairo ...

CFS Warehouse Operations: When a TOS Is Not Enough | Solvo World

A Container Freight Station is the point where container logistics becomes cargo logistics. As long as a container remains sealed, the terminal manages a single transport unit: its location, ...

SOLVO representatives and partners at the SOLVO booth during VILOG 2026 in Vietnam.

From July 30 to August 1, Solvo took part in the Viet Nam International Logistics Exhibition VILOG 2026 at the Saigon Exhibition and Convention Center in Ho Chi Minh City. The exhibition brought ...